Language:中文  English

Company News

SEA&STAR CONSTRUCTION GROUP CO.LTDinvited CCCC senior management seminars

Date:2013-04-07 04:24  PV:1024




    Continuous learning in order to continue the progress. March 2, 2013, the Liaoning the SEA&STAR Construction Group Co., Ltd. in the dawn of the new construction period, specifically from the well-known construction companies CCCC invited senior management, management and construction technology training seminars.
     CCCC First Harbor Engineering Co., Ltd. is a wholly owned subsidiary of China Communications Construction Company Limited, founded in 1945, is China's first Chikko team, known as the "cradle of Chikko" reputation. The company is the port engineering-based, diversified business, cross-industry, cross-regional large-scale state-owned backbone construction enterprises. With a total project contracting premium quality 14 total project contracting a qualified and 15 qualified professional contractor, business areas, including ports, waterways, repair shipyard hydraulic structures engineering and highways, bridges, airports, railways, subway, light rail, large complete sets of equipment installation, industrial and civil buildings, municipal engineering and other large and medium-sized construction projects.
     This was invited to give lectures in CCCC Zhang Hongqi, chief engineer and deputy chief engineer of the High Plains. Zhang Chief Engineer of the important points of the construction management experience sharing with you. The first thing to consider is the establishment of the Ministry of projects in construction management, as quickly build the project department and work with each other. Followed by the management of the headquarters of the Ministry of projects in the early headquarters of the Ministry of projects with the sound department, and a clear division of labor, the latter part of the work as long as a little guidance, their services can be. Form an effective mechanism of competition, so that everyone can promote each other and compete with each other, with the least dry most work. Management of the construction process, when the tender is necessary to form a seamless connection to the scene to conduct investigation as soon as possible familiar with the construction drawings. If it is significant and special projects, to go through a special meeting to discuss the The progress of the construction site in strict accordance with the plan, the problems to immediately analyze and solve. The quality of the project management to establish a sound quality management system, project manager for the first person in charge of overall responsibility for the Chief Engineer, a clear division of labor, there is a vacancy, the responsibility to the people, that understanding. Monitoring of the construction process is also very important, is the problem nipped in the bud, go do not go to the scene is a question of attitude, to the scene did not find the level of the problem, the problem is not promptly corrected responsible. Project cost control management, element management of the project, the project contract management, the balance sheet of the project and project acceptance are also an important part of the successful completion of the project. Engineering also project management and quality management to explain. Carried out a detailed analysis of how to improve the quality awareness of employees and collaborative team.
     Of Liaoning the SEA&STAR Construction Group Group president Sun Yongliang Sunyong Guo, general manager, manager Li Dapeng and all the staff listened to lectures, learn humbly to the domestic industry's top companies, moving to a higher level also contributed to the company management.

All Rights Reserved: SEA&STAR CONSTRUCTION GROUP CO.LTD
Tel:0417-6251997  Address: Part B of Green Industrial Park at Ba Yuquan Yingkou in Liaoning Province.